City of Fort Collins, East Park District Maintenance Facility

City of Fort Collins, East Park District Maintenance Facility

The proposed 6,000-square-foot East Park District Maintenance Facility is designed as a community-oriented maintenance facility with the intent to strategically locate facilities, maximizing efficiencies, and provides localized parks equipment and personnel for daily maintenance tasks. It consists of office space for district parks crews and light-use maintenance bays for servicing equipment and vehicles. There is a large maintenance yard located behind the building that will be used for vehicular parking, bulk park landscape supplies, seasonal equipment storage, a fueling station, trash dumpsters, recycling bins, and enclosed tool storage.

The site design utilizes the existing curb cut for vehicular access. The pond at the southeast corner of the site provides stormwater treatment and detention, and separate LID facilities are also present on the site. The main vehicular path through the site funnels vehicles to the entry gate of the maintenance yard, with public parking for 20 vehicles located off the main drive.

Stats and Results
Location Fort Collins, Colorado
LEED Certification Gold

Share This Project